中文
English

Installation of KECO electric curtain tracks

Steve
2026-01-16
Thanks for your choice of Guangzhou KECO curtain motors. Here are some brief instructions to follow and start your installing.
1) Upon receipt of your parcel of prefabricated   curtain track, please verify that the labels and lengths corresponding to the room. Open the parcel , spread the tracks out on the ground and organize the accessories (installation brackets, motors, remote controls, etc.) in a neat manner.
2) If there are connecting tracks, align the connecting positions of the tracks, flip them over, tighten the corresponding screws of the connectors, and ensure that the connecting positions are equivalent across.
3) Tighten the separated screws of master carriers, and after assembling the master carriers , manually check whether the pulley operates smoothly. It is necessary to slide it several times to identify any issues such as the belt being too tight and crumpled,
4) Install the motor and slide the locking buckle.
5) Plug the power cord into the motor to connect it to the power supply.
6) You can slide the track three times, and the motor will automatically detect and record the limit.

7) Program the remote control, press and hold the pairing button for 3 seconds, then press the remote control's OPEN button. If the motor flashes 3 times, it indicates successful pairing. At this point, you can operate the remote control a few times to check if it slides normally and if the opening and closing directions match the remote control buttons.


8)Check if you have selected the ceiling-mounting installation. verify the type of ceiling brackets you have. for regular use ceiling brackets, secure them to the curtain tracks. If you order the concealed ceiling-mounting brackets,

Preinstall them on the curtain box and secure them with screws. Ensure that the center positions of all top mounting brackets align on a straight line. Install one top mounting bracket approximately every 0.5 meters, and it is recommended to place one at each end of the connecting position to facilitate smooth passage of the master carrier and roller runners.
9) Hoist the track to the curtain recession bay, and for ordinary ceiling mounting brackets, use tools to secure them one by one, preferably starting with the two in the middle. For concealed mounting brackets, simply pull the tabs to lock the track securely.
10) After the track is installed, debug it again to ensure that the track opening and closing functions properly. Finally, you can hang your beautiful curtains.

A0442 2019.6.20 02.jpgA0048 20210513 05.jpg

Read6
share